Definition of Done

Also called: DoD.

Italic text is guidance. Delete it as you fill each section in.

Applies to The product. One Definition of Done per product, shared by every team working on it.
Owner The Scrum Team. If your organisation has a standard, that standard is your minimum and you may add to it.
Last changed YYYY-MM-DD

This is what "done" means. An item that does not meet every criterion below is not part of the Increment: it cannot be released, cannot be shown at the Sprint Review, and returns to the Product Backlog.

Say that out loud once. It is the entire mechanism, and a Definition of Done that is not enforced that way is a wish list.


The criteria

Each row is a binary check on a completed Product Backlog item. State how it is verified and by what.

The verification column is the most important thing on this page. The largest survey of Definition of Done practice found that over 70 percent of projects had criteria that were hard or slow to verify, and over 60 percent had criteria that were impossible to verify at all. An item you cannot check is not a criterion, it is a sentiment, and it will quietly become optional.

Criterion Verified by Automated
Code reviewed and approved by someone who did not write it Branch protection Yes
Unit and integration tests written and passing CI pipeline Yes
No new critical or high static analysis findings CI pipeline Yes
Deployed to staging and exercised against real data volumes Pipeline stage Yes
User-facing text reviewed by ... Named reviewer on the pull request No
Changelog entry added CI check for a changed CHANGELOG.md Yes
Monitoring and alerting in place for the new path Reviewer checks the dashboard link in the pull request No

Rewrite anything that fails this test: could two people disagree about whether it is met, and would you have to argue rather than look? If so, either make it checkable or remove it.

Examples of criteria that fail: "code is clean", "properly tested", "documentation updated", "performance is acceptable", "the Product Owner is happy". Each can be rescued by naming the check. "Documentation updated" becomes "any change to a public endpoint updates the OpenAPI file, verified by a CI diff".


Not yet in our Definition of Done

Criteria you want but cannot yet meet, with what has to happen first and who owns it.

Keep this section. It converts an unrealistic Definition of Done into a roadmap, and it stops the two failures the research identifies: writing criteria the team cannot actually satisfy, and quietly dropping ones that became inconvenient.

Criterion we want Blocked by Owner Revisit
Deployed to production behind a flag No feature flag system Q3
Load tested at 2x peak No load environment

What this is not

Keep this section too. Both confusions below are common and both cause real damage.

Not acceptance criteria. Acceptance criteria are per item and answer "does this do the right thing". The Definition of Done applies to every item and answers "is this releasable". An item can meet all its acceptance criteria and still not be done.

Not a stage gate. These criteria are met continuously during the Sprint, not checked at the end by someone else. If the Definition of Done is being verified in a meeting after the work stops, you have a handoff, not a commitment.


Amendment process

When and how this changes, decided in advance so it does not change under pressure.

The Sprint Retrospective is the natural place. Strengthening it is normal and expected as capability grows. Weakening it to make a Sprint succeed is the point at which the whole mechanism stops working, so require it to be a deliberate, recorded decision rather than something that happens on a Thursday afternoon.

  • Reviewed in the retrospective every N Sprints
  • Any change agreed by the whole Scrum Team
  • Where multiple teams share this product, changes agreed across all of them
  • Changes recorded here with a date and a reason

Notes on using this template

Delete this section too.

Start with what you already do, then add one criterion at a time. A Definition of Done written aspirationally is unmet from the first Sprint, and a standard that is routinely unmet trains everyone to treat it as decorative.

Automate as much as you can, and mark what you did not. Every manual check depends on someone remembering under time pressure, which is exactly when checks get skipped. The automated column tells you honestly how much of this is real.

Where this lives: in the repository. Most of the criteria are enforced by CI, and when the pipeline changes, this document is wrong. Co-location is what makes that visible in review.